Dairy shed concrete slab and milking platform in Auckland

Auckland Dairy Shed Slabs and Milking Platforms

Hard-wearing concrete for milking sheds, yards and platforms, with the falls and drainage dairy work needs.

Locally owned Licensed and insured Own digger and truck fleet Council compliant
Dairy Shed Slabs

Dairy Shed Slabs and Milking Platforms in Auckland

Dairy sheds and milking platforms take constant traffic, wash-down and effluent, so the slab has to stay sound for years. We pour dairy shed slabs across Auckland and the surrounding rural areas, typically from 300 to 1,500 m2, set out with the falls and drainage dairy work needs.

Each slab is designed for wash-down, cow traffic and the loads of plant and vehicles that move through the shed. We handle the full job with our own diggers, trucks and compaction gear, so the ground is prepared properly before any concrete is placed. The result is a safe, hygienic surface that drains cleanly and is easy to keep clean.

  • Milking platform, herringbone and rotary shed slabs
  • Wash-down falls directed to effluent channels
  • Non-slip grooved or textured finishes for cow and worker safety
  • Effluent channels, sumps and drainage connections
  • Reinforced concrete sized for plant and vehicle loads
  • Site excavation, subgrade preparation and compaction
Free estimate

Get a Free Quote

Service
Please select a service
Area Size
Please select an area size
Timeline
Please select a timeline

For urgent driveway repair or installation questions, call 09 977 9966 after sending your details.

Why choose us

Dairy Shed Slabs Services in Auckland

Dairy Sheds and Platforms

We build dairy shed slabs and milking platforms across rural Auckland, designed for wet conditions, heavy cow traffic and daily wash-down, giving farmers a floor that supports efficient, hygienic milking.

Fast-Draining Falls

Falls are set into every slab so water and effluent flow quickly to drains, reducing pooling, slipping hazards and bacteria build-up while keeping the shed easier and faster to clean.

Non-Slip Cow Safety

Non-slip finishes protect both cows and staff, with textured surfaces and grooving options chosen to provide reliable grip in wet, muddy conditions during milking without causing excessive wear on hooves.

Matched to Your Herd

Reinforcement and concrete strength are matched to your herd size and equipment loads, helping the slab resist cracking, abrasion and chemical attack from effluent, cleaning products and years of use.

Planned Around Milking

Our team coordinates excavation, drainage, formwork and the pour, and plans around your milking schedule and calving season so disruption to your normal farm routine stays as small as possible.

Free On-Site Assessment

Contact us for a free on-site assessment of your new dairy shed, platform or upgrade. We provide a clear written quote covering preparation, concrete, finishing and timeframes before work starts.

How we work

Dairy Shed Slabs Experts in Auckland: How We Work

We own our diggers, trucks and compaction equipment, so the groundwork and the concrete are handled by one team from start to finish.

01

Site visit and quote

We visit your dairy, review the shed, platform, herd size and wash-down needs, then give a clear quote.

02

Excavation and subgrade

We excavate and compact the subgrade, setting falls so water and effluent flow quickly to the drains.

03

Formwork and reinforcement

We set edges, levels, falls and steel reinforcement to the engineer specification for cow and equipment loads.

04

The pour

We place the concrete to the right thickness and grade, keeping the platform and shed floor level.

05

Finishing and curing

We add non-slip textures or grooving for safe hoof grip, then cure the slab before milking resumes.

06

Handover

We complete a final check, tidy the shed and advise when cows can return to the platform.

Technical detail

Specifications and Options

Slab thickness
Typically 125 to 200 mm depending on loads
Reinforcement
Steel mesh or rebar to engineer specification
Concrete strength
20 to 30 MPa depending on use
Falls and drainage
Graded to effluent channels and sumps
Finish
Non-slip grooved, broom or textured
Joints
Saw-cut control joints to manage cracking

All work follows NZS 3109 for concrete construction, NZS 3101 for concrete structures, and any engineer specifications prepared for your site.

Why choose us

Why Choose Our Dairy Shed Slabs Contractor in Auckland

A dairy shed floor works harder than almost any other concrete surface on your farm, so the contractor you choose matters. We are a locally owned Auckland concrete company, licensed and insured, with an earthmoving fleet that handles excavation, compaction and cartage. We understand how a milking platform operates, from wash-down routines and effluent flow to cow traffic and grip, and we build falls, drains and finishes to suit. Every slab is designed with the right reinforcement and concrete strength for equipment loads and constant moisture, and we work to engineer requirements and council standards. We plan pours around your milking schedule and calving season, keeping disruption low and communication clear. You receive a transparent written quote before work starts, careful site management throughout, and a tidy handover. Contact us for a free on-site assessment of your dairy shed project.

Dairy shed concrete slab and milking platform in Auckland
Questions answered

Frequently Asked Questions

How thick should a dairy shed slab be?

It depends on the loads the slab will carry. Milking areas are often 125 to 150 mm, while sections that take heavy plant or vehicles may be thicker. We work to your engineer specification where one is provided.

How do you manage effluent and wash-down water?

We plan the falls before the pour so wash-down water runs to channels and sumps connected to your effluent system. Getting the grade right is the most important part of a dairy slab.

What finish is best for a milking shed?

A non-slip grooved or textured finish gives cows and workers grip in wet conditions while staying easy to clean. We match the finish to how each area of the shed is used.

How soon can the shed be used after pouring?

Concrete keeps gaining strength over about 28 days. Light foot traffic is usually fine within a few days, and we advise on timing for stock and heavy plant for each pour.

Do you work outside Auckland city?

Yes. We work across rural Auckland, including Pukekohe, Drury, Karaka, Clevedon and further out toward Warkworth and Wellsford.

Ready to get started?

Get a Free Dairy Shed Slabs Estimate

Tell us about your site, approximate size and timeline, and we will come to you, assess the ground and provide a clear quote.

Dairy sheds Silage and feed pads Farm and shed slabs Truck yards and hardstand Warehouse floors Container yards